![]() |
|||||||||||||||||
| Some of the culverts in South Delta that cross under the Hwy. 99 needed replacement and slipling was the least disruptive. Other culverts under Hwy 99 have been inspected. Click here for some photos. Click on any picture to go to the image gallery of this process. |
|||||||||||||||||
![]() |
|||||||||||||||||
| Although the water is brown, PW Trenchless uses biologists to place nets across the drainage ditch and remove all the fish to safety for the duration of this process. | |||||||||||||||||
![]() |
|||||||||||||||||
| The new culvert is assembled on site. | |||||||||||||||||
![]() |
|||||||||||||||||
![]() |
|||||||||||||||||
![]() |
|||||||||||||||||
To the left the pipe covered in duct tape is used to pump grout into the void for structural support. |
|||||||||||||||||
| Projects Equipment References Home e-mail us. Contact the webmaster Cam@carnut.ca |
|||||||||||||||||