As the City of Langley grows some of the older pipes are becoming undersized and inadequate.
Through one of the busy intersections was a line that was replaced by pipebursting.
512m of 15" pipe was upsized to 16".
45m of 18" pipe was upsized to 20".

Click on any thumbnail picture to go to a larger image.

2 pumps were used to handle the flow of the bypass. Back flow valves.
The By-pass pipe.
Entrance pit
This empty lot was used as a staging area the HDPE Pipe.
The bypass line was laid through a temporary trench through driveways and covered with steel plates to cause the least inconvenience.
The winch is set-up inside a manhole.
The entrance pit was quite long as it was used for 2 directions of bursting.
.
The head is "threaded" through the Trench shoring cages.
The manhole seen in the bottom of the images was "windowed" to allow for the pipe to pass through it at a easy angle for entry into the host pipe.