This project was upgrading a sanitary sewer for the GVRD. Located at the Surrey Fraser Docks this project included approximately 80m of open cutting 600mm pipe, and 400m of sliplining 450mm pipe.

Click on thumbnails for larger versions.

The image on the left shows the shorter of the two sliplines.

The image on the right is of the open cut part of the project

The sliplining beginning The slipline near the end. Fusing of the pipe.
Tapering the end of the HDPE pipe.
Projects
Equipment
References
Home
e-mail us.
Contact the webmaster Camsfam@yahoo.ca