PW Trenchless Highway 99 Fall 2023 Fall 2023 Peacock Brook Surrey BCThe Peacock Brook culverts under Highway 99 was replaced via Sliplining. There were two culverts...
Pw Trenchless Vancouver 2024 During the Spring of 2024, PW Trenchless replaced part of the watermain running along the beach in Spanish Banks in Vancouver. The watermain...
Pw Trenchless Victoria 2023 During 2023 PW Trenchless Construction Ltd. re-lined three sections of existing sewer mains in Victoria, with GRP pipe (Glass Reinforeced...
2022 PortMoody September 12 On September 12 , 2022, Insituform started to line the existing sanitary sewer lines that go through the Old Orchard Park....
2022 Port Moody Sept 28 On September 28 , 2022, Insituform started to line the existing sanitary sewer lines that go through the Old Orchard Park. Insituform® CIPP...
The City of Richmond has commenced a 5-10 year project to replace and improve the water mains, sewers and roadways in the Burkeville area of Richmond near the Vancouver...
The crew at PW Trenchless were up in Squamish to replace a sewer main under highway 99 via Pipe Bursting. On November 15, 2022, the first burst of 135 metres took place...
This was a 120 metre burst and was the longest of the three burst in this project for the Township of Langley. Working on 200th Street has it’s challenges but the...
Sewer upgrade from 8" 200mm to 16" 450mm Numerous runs and a few open cut section to replace over 300 m of pipe and manholes. The section are over 4 m deep and 200th is...